I Hate Delays
When I was working in engineering, we had a lot of meetings in a week. Most of the meetings were about pilot runs or production data that engineers needed to take note off. Frankly, I hated it when I had to run from the production line to the meeting room a few blocks away and sometimes we had to wait outside because the room was still occupied. When you have urgent pilot run, you just don’t want to waste a single minute to get it done or watching the machine. You just can’t trust the technician or operator because the process parameters were not optimized.
Thus, I was quite annoyed if the meeting was not held on time. They should have a Scheduling Software to arrange the usage of meeting room or projectors. It’s a big semiconductor company, so they can afford a software!
Luckily, I am retired from engineering. It’s so good to quit a job just like that!

Leave a Reply